![]() ![]() Work for the modeling is on hold in order to work on the program upgrade for an internal web site of the mapping to be used by EWD personnel only. EWD staff is now reviewing the record drawings and gathering pertinent information to combine with the 6 inch backbone portion. A presentation was given at the Manager’s Meeting held August 11, 2010.ĮWD staff has begun work on the modeling of the 6 inch force main, this portion of the backbone of the pipes has been completed. Work for the project is on hold in order to work on the program upgrade for an internal web site of the mapping to be used by EWD personnel only. The entire distribution system in Charlotte County is completed. A data base has been created for Charlotte County area to connect the water mains to the fire hydrants and valves. GPS information has been completed on the fire hydrants and water main valves as of March 23, 2010. PBS&J will review the comments and respond to SWFWMD by September 25, 2010. ![]() On June 25, 2010, EWD received 13 comments on the report from SWFWMD. The 2009 Annual Wellfield Management Report was submitted March 30, 2010. Currently awaiting any comments from FDEP. EWD’s review comments were incorporated into the report, which was finalized and submitted to FDEP on May 13, 2010. A Draft MIT report was submitted to EWD for review and comment. The Mechanical Integrity Test (MIT) of the R/O WTP DIW #1 was completed on April 6, 2010. PBS&J received the revised MOR reporting form modifications from FDEP and forwarded to EWD staff. At this time, PBS&J have not received any comments or request for additional information from DEP. The DIW annual operating reports were finalized after EWD’s comments were incorporated, and submitted to FDEP on April 23, 2010. ASRus continues to work with EWD staff to equip the six new piezometers with water level recorders for continuous monitoring at the site to allow pumping of the storage pond once the permit modification is received and hydrologic conditions are favorable. We are awaiting approval of the permit modification by FDEP. ASRus worked with EWD staff to submit a timely response to FDEP addressing the issues raised. ASR Supplemental Reclaimed Water SourceįDEP issued a request for additional information on the permit modification submitted on May 23, 2010. EWD has revised the residential reuse irrigation schedule to Tuesday, Wednesday, and Thursday. The allowable storage volume in the well is 820 MG. The well is currently shut-in, with a total of 756 MG in storage as of July 19, 2010. Recovery from the ASR well began on May 5, 2010, and approximately 38 MG was recovered from the well. Reclaimed Water Aquifer Storage RecoveryĪSRus assisted EWD staff with preparation of the June 2010 monthly report to DEP’s Underground Injection Control Staff. Cross Connection Control & Backflow Prevention Program Manualġ.Reclaimed Water Frequently Asked questions (FAQ). ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |